Safe work method statements
Demolition of load-bearing structures, work likely to disturb asbestos, and trenching deeper than 1.5 metres are all high risk construction work under the Work Health and Safety Regulation 2011. A safe work method statement (SWMS) is prepared before any of this work starts and is kept on site while it is under way.