Commercial strip-out in Toowoomba

Burke Industries strips out offices, shops, schools and commercial buildings across Toowoomba and the Darling Downs, from soft strips to full internal strip-outs and lease-end make-good. We're a licensed demolition contractor with a Class A asbestos removal licence (2302383), and a family-owned Toowoomba business since 1987.

Request a quote Call (07) 4613 4222

What does a commercial strip-out include?

A strip-out removes the fit-out from a building and leaves the structure standing. We tailor the scope to the reason you're stripping:

Soft strip

Removing non-structural items, such as carpet and floor coverings, suspended ceilings, partitions, joinery, fixtures and loose services, ahead of a refurbishment or before structural demolition starts.

Internal strip-out

A full strip back to the base building: shell, slab and core. It usually comes before a major refit or a change of use.

Office and retail make-good

Removing a tenant's fit-out and returning the tenancy to the condition the lease requires, for offices, shops, shopping centre tenancies and showrooms.

Strip-out before refurbishment

Clearing a floor, block or building so the new works can start on a clean, identified base, with asbestos and services sorted first.

Why check for asbestos before a strip-out?

Fit-out in older buildings is where asbestos hides: ceiling tiles, wall linings, vinyl floor tiles and their adhesive, fire doors, and service risers. Queensland's Work Health and Safety Regulation 2011 sets out the duties:

Before refurbishment.
All asbestos likely to be disturbed at a workplace must be identified and, so far as reasonably practicable, removed (s 456).
The register.
It must be reviewed for the work and given to the contractor (ss 448–450). If there's no register, a competent person must inspect first (s 451).
Low density board.
LDB ceilings and walls, common in 1950s–1970s buildings, have been classed as friable in Queensland since May 2021 and need a Class A licensed removalist.

We hold WorkSafe Queensland Class A asbestos removal licence 2302383, so we can remove friable and bonded asbestos as part of the strip-out, with the control plan, five-day notice, air monitoring and clearance that licensed removal requires. See our asbestos removal service in Toowoomba.

Can you strip out while the building stays open?

Most of our strip-outs are in buildings where something else is still running: other tenants, a school, an office floor above. We plan for:

Separation.
Hoarding, protected paths and access control between the work area and occupied areas.
Dust and noise.
Dust suppression, enclosed chutes or bins, and noisy work scheduled to suit the building.
Waste routes.
Planned bin locations and lift or loading dock bookings, so waste doesn't move through public areas during trading hours.
Asbestos areas.
Signs and barricades (s 469), restricted access (s 470), and notice to occupants before removal starts (s 468).
Services.
Isolating only the services in the strip zone, and keeping fire services live for the rest of the building.

What happens to the waste?

Strip-outs produce mixed waste, and mixed waste is the most expensive kind to dispose of. We separate on site, so more of it is recycled and less goes to landfill at general waste rates.

  • $0scrap metal at Toowoomba Regional Council's facility (2026/27)
  • $64.85/tclean concrete, over 400 kg
  • $289/tgeneral waste to landfill, for comparison
  • $100/tQueensland waste levy (regional, 2026-27), avoided on recycled material

Concrete from strip-outs and demolition is crushed at our own Toowoomba facility. Across our demolition work we aim to recycle at least 85% of material.

Strip-out or full demolition?

Strip-outFull demolition
What's removedNon-structural fit-out, finishes and services. The structure stays.The whole building or structure, down to the slab or footings
WorkSafe demolition licenceGenerally not, while work stays non-structuralRequired for most commercial demolition
Notice to WorkSafe QueenslandOnly for licensed asbestos removal (5 days)Also for structures 6 m or higher, load-shifting machinery on suspended floors, or explosives (s 142)
Council approvalCheck with your certifier, especially where exits, fire separation or services changeBuilding works application and bond decision (Toowoomba Regional Council)
AsbestosIdentify and remove what the strip will disturb (s 456)Identify and remove what demolition will disturb (s 452)
Typical useRefits, make-good, change of tenant, pre-demolition soft stripRedevelopment, end-of-life buildings

If the strip-out turns into structural work, we can carry on as a licensed demolition contractor. See our building demolition service in Toowoomba.

How much does a strip-out cost?

2026 industry guides put commercial strip-outs at about $30–$50 per m² for a basic strip, $50–$80 for standard and $80–$150 or more for complex jobs. A 250 m² tenancy typically costs $8,000–$20,000. These are published guide ranges, not Burke's prices. The biggest variables are asbestos, access (floor level, lifts and loading docks), after-hours requirements, how much of the services must be made safe, and how much waste can be recycled. A site inspection with the asbestos register is the fastest way to a firm price.

Strip-out questions

How much does a commercial strip-out cost?

2026 industry guides put commercial strip-outs at about $30–$50 per m² for a basic strip, $50–$80 for a standard strip and $80–$150 or more for complex jobs. A 250 m² tenancy typically costs $8,000–$20,000. Asbestos removal, after-hours work, services disconnection and making good are usually priced separately, so compare quotes on the same scope.

What is the difference between a soft strip and a full strip-out?

A soft strip removes non-structural fit-out and contents, such as carpet, ceilings, partitions, joinery, fittings and loose services, and leaves the building shell. It often comes before refurbishment or demolition. A full strip-out goes further, back to the base building, slab and structure, usually ahead of a major refit or lease-end make-good.

Do I need an asbestos check before a strip-out?

Yes. Before refurbishment at a workplace, asbestos likely to be disturbed must be identified and, so far as reasonably practicable, removed, and the register reviewed for the work. Ceilings, wall linings, vinyl floor tiles and service risers in older buildings often contain asbestos, including friable low density board, which needs a Class A licensed removalist.

Does a strip-out need a demolition licence?

Removing non-structural fit-out generally isn't demolition work as Queensland's Work Health and Safety Regulation defines it, which covers dismantling structures or load-bearing parts. Once a strip-out touches load-bearing walls, slabs or structural elements, it becomes licensed demolition work. We hold a WorkSafe Queensland demolition licence, so the scope can extend without changing contractor.

Can you strip out a tenancy while the rest of the building is occupied?

Yes. Work in occupied buildings needs separation from other tenants, controlled access, dust and noise controls, and planned waste removal routes. Any asbestos removal needs signs, barricades and restricted access, and the person managing the building must tell occupants before it starts. Noisy work can be scheduled to suit the building.

What happens to the waste from a strip-out?

We separate materials on site, such as metals, timber, plasterboard, concrete and general waste, so more of it is recycled. In Toowoomba, scrap metal is free to drop off at council's facility and clean concrete costs $64.85 per tonne, against $289 for general waste. Recycled material also avoids the Queensland waste levy.

Is a make-good the same as a strip-out?

Not always. A make-good returns a tenancy to the condition the lease requires, which may mean a full strip-out, a partial strip, or removal plus repairs and repainting. Check the lease's make-good clause and any dilapidation report before scoping, so the strip-out matches what the landlord can actually require.

Planning a strip-out or make-good?

Send us the address, floor area, asbestos register and your lease or refurbishment date. We'll inspect the tenancy and give you a scoped price with asbestos, waste and access set out.

Book a strip-out site assessmentCall (07) 4613 4222

Sources

  1. Work Health and Safety Regulation 2011 (Qld). Sch 19 (definition of demolition work: a structure, or a load-bearing or integrity-related part), s 142 (demolition notice), s 143 (demolition licence), ss 448–451 (register before refurbishment), s 456 (asbestos before refurbishment), ss 466, 468–470 (notice, telling persons, signs and barricades, limiting access).
  2. WorkSafe Queensland: demolition licence
  3. asbestos licence registers. Burke Class A 2302383.
  4. ASSEA LDB product guide. friable in Queensland since May 2021.
  5. Sydney Fitout Group: office strip-out cost. (Sep 2026): $30–$150+/m²; a 250 m² tenancy $8,000–$20,000. These are Sydney figures, used as a guide range.
  6. TRC 2026/27 register of fees and charges. scrap metal no charge, clean concrete $64.85/t, general waste $289/t.
  7. Queensland waste levy rates. $100/t regional general waste, 2026-27.
  8. TRC: Removal of buildings. building works application and bond for demolition.
  9. ASIC company dataset. registered 1987.
  10. Burke additional services. crushing facility, 85% target.

about us

Business Hours:
Mon - Fri

Sat - Sun
8:30AM - 3:00 PM

Closed
ABN
55 010 719 525

Contact Us

Our Location

Content, including images, displayed on this website is protected by copyright laws. Downloading, republication, retransmission or reproduction of content on this website is strictly prohibited. Copyright © . Website design and hosting by Smart Local. Terms of Use | Privacy Policy